Govt Blames PTI Regime for ‘Criminal Negligence’ on Neelum-Jhelum Power Project: PM Orders Urgent Review

Date:

PM Shehbaz Sharif blames the PTI regime for criminal negligence on the Neelum-Jhelum Hydropower Project. Discover the latest updates, criticisms, and future steps for this crucial power generation project.

Prime Minister Shehbaz Sharif has recently taken decisive action regarding the Neelum-Jhelum Hydropower Project, which has been facing severe issues under scrutiny. Following a major breakdown in the project’s operations, the PM has ordered an urgent review and formed a high-level committee to address what he calls criminal negligence by the previous PTI administration. This article delves into the PM’s latest directives, the failures of the PTI regime, and the future of the crucial hydropower project.

What Went Wrong with the Neelum-Jhelum Power Project?

On May 2, 2024, the Neelum-Jhelum Hydropower Project stopped generating power altogether, sparking a political and administrative firestorm. The PTI regime is accused of criminal negligence for failing to address significant issues that emerged in 2021. Here’s a breakdown of the situation:

Key Issues Identified:

  • Power Generation Halted: Power generation reduced on April 29, 2024, and completely ceased on May 2, 2024, due to a pressure drop in the right and left headrace tunnels (HRT).
  • Faults Ignored: In 2021, a significant decrease in power output was observed but was ignored during the PTI rule.
  • Construction Failures: The report cites that geophysical and seismic factors were overlooked during construction, leading to ongoing problems.

Learn More:

PM Shehbaz Sharif’s Urgent Response

Prime Minister Shehbaz Sharif has taken immediate steps to address the breakdown in the Neelum-Jhelum Hydropower Project. Here’s what he’s doing to fix the crisis:

PM’s Directives:

  • Forming a Committee: A committee has been established to investigate the recent failures and to find ways to reactivate the project.
  • Identifying Responsible Parties: The committee will determine who is responsible for the criminal negligence and recommend strict actions.
  • Completing Investigation Reports: The PM has ordered the completion of the investigation reports to ensure a swift resolution.

Read More:

Why the PTI Regime Faces Criticism

The PTI administration is under fire for its handling of the Neelum-Jhelum Hydropower Project. Here’s a detailed look at the criticisms:

Criticisms of PTI’s Approach:

  • Neglect of Early Warning Signs: Issues detected in 2021 were not acted upon, resulting in the complete shutdown of the project.
  • Failure to Conduct Third-Party Validation: There was a lack of third-party validation, which could have identified and addressed the defects.
  • Ignoring Expert Recommendations: Geophysical and seismic factors ignored during the construction contributed to the project’s failures.

Explore Further:

The Investigation Report: What We Know So Far

A preliminary investigation report presented by Shahid Khan, former federal interior secretary, highlights several critical issues:

Findings from the Report:

  • Rock Burst Zone: The fault that caused the closure was identified as a rock burst zone.
  • Concrete Lining Issues: The report revealed that the concrete lining of HRT was inadequate, leading to pressure drops and subsequent failure.
  • Economic Impact: The closure of the project is causing millions of rupees in losses to the national exchequer.

Read More:

What’s Next for the Neelum-Jhelum Hydropower Project?

The immediate future of the Neelum-Jhelum Hydropower Project depends on the actions taken by the new committee and the PM’s directives.

Upcoming Steps:

  • Reactivating the Project: The committee’s primary task will be to reactivate the project and restore its power generation capabilities.
  • Implementing Recommendations: The committee will also focus on implementing measures to prevent future issues.

Discover More:

Conclusion

The Neelum-Jhelum Hydropower Project crisis has brought criminal negligence by the PTI regime into the spotlight. Prime Minister Shehbaz Sharif is taking decisive action to address the failures and restore the project’s operations.

The PTI administration is criticised for ignoring crucial issues and failing to conduct proper third-party validation. The current government’s approach includes investigating these failures and implementing necessary repairs to get the project back on track.

By understanding these developments, you can better grasp the importance of effective project management and government oversight in major infrastructure projects.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

$1.17 Trillion Credit-Card Debt: Signs of Improvement as Inflation Eases

Americans' $1 Trillion Credit-Card Debt: Is the Tide Finally...

Matt Gaetz Resigns Ahead of House Ethics Committee Report on Allegations of Misconduct

In a stunning development in Washington, Rep. Matt Gaetz...

Man Dies in Suspected Failed Attack Outside Brazil Supreme Court Days Before G20 Summit

In a dramatic incident that unfolded outside Brazil’s Supreme...

Bethany Hamilton Revealed as Macaron on ‘The Masked Singer’ – Here’s What You Missed

The excitement around The Masked Singer Season 12 is...